Conversion projects
“North Oxford Developments completely transformed our home. What started as a tired, outdated property is now a beautiful, modern space that works perfectly for us as a family. The new extension and open-plan kitchen have made such a difference — it’s now the heart of our home. The quality of the finish throughout is excellent, and every detail was clearly thought through. The team were reliable, professional, and always kept us informed. They stuck to the timelines they set out and made the whole process far less stressful than we expected. We’re absolutely delighted with the end result and wouldn’t hesitate to recommend them.”
“North Oxford Developments delivered an excellent result on this project. Building two new flats from the ground up alongside an existing property is no small task, but they managed it with confidence and professionalism throughout.
The finish on both units is to a very high standard, and their attention to detail really shows. They were well organised, communicated clearly, and kept the project running smoothly from start to finish.
We were particularly impressed with how they handled the logistics and coordination across the site. The end result speaks for itself, and we’d be more than happy to work with them again.”
proud to be members of FMB, NFB & HBF
Not always. Class MA permitted development allows many Class E buildings, including shops and offices, to become homes through prior approval instead of full planning permission, provided the conditions are met. Listed buildings and some protected areas are excluded, and Article 4 directions can remove the right. Building Regulations approval is still required, so check with your local planning authority first.
Prior approval is a lighter application for development that is already permitted in principle. The council only assesses specific matters, which for Class MA include transport, contamination, flooding, noise, natural light and, in conservation areas, ground-floor impacts. If approval is given, the conversion must be completed within three years. It is not the same as full planning permission.
At least two years. The building must have been in qualifying commercial, business and service use for a continuous period of two years before the prior approval application. The earlier requirement for it to be vacant for three months was removed in March 2024. Your local planning authority may ask for evidence of that use, such as leases or trading records.
Yes. Our Horsefair project in Chipping Norton turned a former restaurant on the high street into a front commercial unit suitable for office or retail use, with a self-contained home at the rear. Mixed-use schemes need careful planning around separation, fire safety, sound insulation and access, and they often need full planning permission rather than prior approval.
Converting a commercial building into homes is a material change of use, so the new dwellings must meet requirements including fire safety, sound insulation, ventilation and energy efficiency. You will need approval from a building control body, with inspections as the work progresses. We coordinate the trades and work alongside your architect and building control so each stage is ready for inspection.
Talk to one of our experienced builders